Contributions application

From Help

Getting started - How to use the Contributions tool on the Portal

! Only users logged on the Portal can reserve/upload contributions!

(To request an ETSI on-line account)


  • Once logged on, select the relevant group, e.g. for Technical Committee “DECT”:
    Picture2.png
  • Select the tab “Contributions”


Identify the Contribution type

Under the New contribution drop-down list there are several types of contributions available

Picture4.png

The information for the types New Draft and New WI Proposal / Description are explained separately in this Helpfile. Select here below:


Create a contribution type: Other Contribution
Create a contribution type: New WI Proposal / Description
Create a contribution type: New Draft
Revision of existing contributions

Create contribution type: Other Contribution

Picture4.png

This type of contribution (Other Contribution) is typically used for PowerPoint presentations, supporting material and analysis.

  • Click on Other Contribution in the dropdown menu

NOTE: The information for the type Other Contribution in this Helpfile is also valid for the contribution types Change Request, Liaison Statement IN, Liaison Statement OUT, Meeting Agenda and Meeting Report.


General tab

Picture5.png

Under the General tab the mandatory fields are marked with a red star *.

  • Title *: The title given will be used as the name of the uploaded file
  • Type *: Other Contribution is pre-selected
  • from Source *: By default the logged-in user
    • To modify the Source:
    • Click on Change(a pop-up Manage Source opens - see next page in this Helpfile by clicking on Next)
  • Abstract: Complementary document information can be added in this field.


4 different types of Source are available:

Picture6.png

Organisation(s): Only active ETSI members/participants will be displayed

ETSI committee(s): Active ETSI Technical Body/Industry Specification Group/Working Group

Roles: Chairman, Vice Chairman, Secretary, Rapporteur, WG/TG Chairman, ETSI Secretariat, ETSI Director-General, Other

Other: Free text describing a role not matching one of the above categories

NOTE: There can be more than one Source for a contribution (example: company A, company B, and company C, but all of the same type).


  • Use the Filter, the Add button and the Done button to select the appropriate criteria
  • Enter or modify the information as appropriate


Picture7b.png

  • Main Contact *: The logged-in user
  • Additional contact info: If applicable
  • Input for Committee *: The TB, ISG or WG is automatically set, but can be changed
  • Contribution for *:Decision
    Discussion or Information
    Select the appropriate one
    Meeting – Allocation
    Click on the Change button to assign the contribution to a future meeting
    (To remove a wrongly assigned meeting allocation, click on the red cross Red Cross.png ).
    Follow the instructions in the blue text in the pop-up window and click on Done.
    The system will return to the contribution creation screen (next page in this Helpfile).
    Contributions assigned to a meeting are then listed in the Meeting's Document list.
    Related WIs or Deliverables
    • Click on the Change button to attach the contribution to an existing Work Item. The system displays all the work items attached to the group.
    • Select the relevant work item(s) in the displayed list and click on Add. The selected Work Item(s) appears in “List of related WIs” . (To remove a Work Item selected in error, click on the red cross Red Cross.png )
    • Click on Done and the system returns to the Contribution creation screen.

Related Contributions tab

Related Contributions can be linked together (via the General tab or via the Related Contributions tab).

This would be used for transparency when there are existing contributions on the same topic.

To complete the Related Contributions tab:

  • Find the contribution in the list or using the Filter button
  • Click on Add
  • Click on Save changes

A pop-up message will confirm the contribution number and its status RESERVED.

NOTES:

A contribution in status Reserved can be edited without generating a new file.

Related contributions can be removed by clicking on the red cross Red Cross.png .

Create a cover page for type: Other Contribution

The cover page is the ID card of the contribution.

It retrieves the information from the General tab.

To generate a cover page:

  • Click on Get cover page
  • Update the cover page in MS Word and Save
  • Zip the cover page and the contribution

Make available a Contribution type: Other Contribution

  • Click on Upload/Make Available
  • Select the zip file
  • Click on Make Available

The contribution with a full filename will then be available on the ETSI portal.

  • Subscribe to Contribution upload Notification to receive an e-mail that a new contribution has been uploaded

Create a Contribution type: New Work Item (NWI) Proposal

It is mandatory for New Work Item proposals to be created under the type NWI Proposal / Description in order to generate an entry in the ETSI Work Programme.

  • Click on New WI Proposal / Description in the dropdown menu

For this type of contribution there are 3 tabs: General, WI Details and Related Contributions.

To see how to complete these tabs, see the next pages in this Helpfile.

General tab

The Contribution Creation screen opens in a new window on the General tab

Mandatory fields are marked with *.

Title *: To describe the content of the contribution

(The system will use the title given in this field as the name of the uploaded file)

Type *: New WI Proposal / Description type is pre-selected

Source *: By default the logged-in user

To modify the source:

  • Click on the  Change button (a pop-up Manage Source opens - see next page

in this Helpfile by clicking on Next)

4 different types of Source are available:

Organisation(s): Only active ETSI members/participants will be displayed

ETSI committee(s): Active ETSI Technical Body/Industry Specification Group/Working Group

Role(s): Chairman, Vice Chairman, Secretary, Rapporteur, WG/TG Chairman, ETSI Secretariat, ETSI Director-General, Other

Other: Free text describing a role not matching one of the above categories

NOTE: There can be more than one Source for a contribution (example: company A, company B, and company C, but all of the same type).

  • Use the Filter, the Add button and the Done button to select the appropriate criteria
  • Enter or modify the information as appropriate

Main Contact *: By default logged user

Input for Committee *: Automatically set, but can

be changed to another TB or WG or ISG

Contribution for *:

            Decision,             Discussion or Information

  • Select the appropriate one

Meeting – Allocation

  • Click on the Change button to assign the contribution to a future meeting

(To remove a wrongly assigned meeting allocation, click on the red cross Red Cross.png )

  • Follow the instructions in the blue text in the pop-up window and click on Done.

The system returns to the contribution creation screen (click Next on this page).

Contributions assigned to a meeting are then listed in the Meeting's Document list.

Related WIs or Deliverables

  • Click on the Change button to attach the contribution to an existing Work Item or deliverable.

The system displays all the work items attached to the group.

  • Select the relevant work item(s) in the displayed list and click on Add.

(To remove a Work Item selected in error, click on the red cross  Red Cross.png )

The selected Work Item(s) appear on the left part of the screen.

  • Click on Done and the system reverts to the contribution creation screen with the related WI attached.
  • Abstract: Complementary document information can be added in this field.

WI Details tab - Introduction

To complete the Work Item (WI) Details tab for a New Work Item Proposal / Description, select:

3.3 Creation of a New WI (Deliverable)

To complete the WI Details tab for the Revision of an existing Work Item, select:

3.4 Revision of an existing Deliverable

WI Details tab - Creation of a New Deliverable

Mandatory fields are marked with *

WI Committee *: TB/WG/ISG automatically set by the system

  • Use the drop down menu to change Technical Body or Working Group or Industry specification Group.

Project: To be explained

Deliverable *: New (by default)

Standard Type *:

  • Click on the drop down menu and select an ETSI deliverable type

For ISGs only deliverable types GR and GS are permitted.

To be published as Version: Automatically set to 1.1.1 for new deliverables.

Requested WI Reference:

First field: prefilled with the name of the ETSI group.

Second field: the next available ETSI WI Reference number (can be manually updated).

Third field: optional for a series of documents divided in parts.

Formal Title *: By default the TB, WG or ISG short name (see ETSI Directives, TWP, Clause 1.6).

Formal Title 2 *: Refers to the domain in which the work will be carried out.

Formal Title 3: Indicates the separate parts of a specification.

Working Title: Short name that is displayed on the Latest Drafts application on the portal.

Scope of Work:

  • Explain the work to be done.

Rapporteur:

  • From the drop down menu type the first name or the surname and the full details will appear.

Only names registered in the ETSI database will be displayed.

Supporting companies:

  • Click on Add/Remove.
  • In the Search field first enter the name of the organisation then click on the Filter button.

   The full name should appear in the box below.

  • Select the organisation from the list and click on Add, or double click on the name to move it to the left side of the screen.

NOTE: Minimum four supporting ETSI Full and or Associate Members per Work Item.

Design for All Assessment:

  • Click on the Assess button, review the fields and click Done.

To complete the Schedule, Aspects and

Keywords and Frequencies fields:

  • Expand the drop down menus on the right side of the screen to open (and close) these sections.

Schedule:

  • Complete the TB adoption, WG and TB approval dates. These are required in order for the NWI proposal to be accepted.

To see how to complete these fields, see the

next page in this Helpfile

Aspects and Keywords:

  • Select the appropriate Aspects.
  • Select Keywords by clicking on Add/Remove.
  • Search the keywords and add them with a double click.
  • Click Done to save the selection and close the window.

A minimum of 2 Keywords are required.

Frequencies: (If applicable)

  • Select application using the drop down menu and the related frequency.


If the WI Details tab is not fully completed it is not possible to ACCEPT the WI proposal.

WI Details tab - Revision of an existing Deliverable

For the Revision of an existing Deliverable the system will retrieve the details from the ETSI Work Programme and pre-fill a number of fields.

Deliverable *: Revision of (by default)

  • Enter the ETSI number (e.g. GR NFV-IFA028) or the Work Item reference using the drop down menu.
  • Verify and update, as necessary
  • Click on Save changes.

A pop-up message will confirm the contribution number and its status RESERVED.

During the creation of the New WI Proposal, the system will display a warning at the top right corner of the WI Details tab:

WI proposal is NOT READY for approval (mouse over to see why)

  • Put mouse over this warning to see the missing information.

The warning is refreshed automatically.

Once all the mandatory fields in the WI Details tab have been filled in, the system will display:

WI proposal is complete (Ready for approval)

Check a Work Item (WI) Proposal / Description

A contribution in status Reserved does not need to uploaded straight away.

If the proposal is incomplete:

  • Select Complete now or Complete later

If the proposal is complete:

  • Select Yes now or No later

NOTE: In both cases, a confirmation note will indicate that the contribution has been reserved and the allocated Contribution number.

Create a cover page for a New WI Proposal / Description

The cover page is the ID card of the contribution.

It retrieves the information from the General tab.

A cover page can be generated in 2 ways.

By the system or by the user.

By the system:

  • Click on Get cover page

A zip file will be generated with the cover page and the NWI proposal.

  • Click on Make available

By the user:

  • Click on Get cover page
  • Update the cover page in MS Word and save.
  • Zip the cover page and contribution together
  • Click on Make available

Preliminary Work Item number (PWI)

The PWI is the identification number of the Work Item until it is approved at the TB/ISG level.

Once approved at TB/ISG level the Work Item will get the WI reference as displayed in the Work Item form.

The PWI number consists of the following:

PWI_TB/ISG name_Year+sequence number_version

For example, PWI_MEC_1749_v2 is a proposed Work Item to ISG MEC, the 49th proposal in 2017 and it is version 2 of the proposal).

The PWI number is visible in 2 places:

1.In the WI Details tab in the NWI proposal

2. In the Work Programme

Make available a New WI Proposal / Description

The Related Contributions tab allows:

Linking contributions allows for transparency and cross-reference when there are existing contributions on the same topic.

Related Contribution tab

Search by either a keyword or the contribution number using

  • Select the related Contribution in the list
  • Click Add
  • Click on Save changes

NOTE: Related contributions can be removed by clicking on the red cross Red Cross.png

History tab

The History tab displays the life-cycle of a contribution.

Revise a Contribution - Introduction

To update the content of a Contribution which is currently in the status Available

  • Create a Revision of the Contribution via:

a) The Contributions tab

or

b) The Meetings tab

Revise a Contribution type: Other

From the Contributions tab:

  • Identify the Contribution to be revised and

click on the glasses     XXXXX   icon.

The General tab opens

  • Click Revise on the bottom of the screen
  • Update the fields (e.g. Meeting Allocation, Abstract)
  • Select the revised file to upload
  • Click on Save changes followed by Upload/Make Available

The contribution number will automatically reflect the revision number (i.e. r1, r2).

From the Meetings tab:

  • Identify the meeting that the contribution is attributed to
  • Click on the meeting hyperlink The Meeting Information page opens.
  • Click on the link to List of xxx Contributions assigned to this meeting
  • Identify the contribution to revise and click on the    Glasse XXX   icon.

The General tab opens

  • Click on Revise on the bottom of the screen.
  • Update the fields (Meeting Allocation, Abstract)
  • Select the revised file to upload
  • Click on Save changes followed by Upload/Make Available The contribution number will automatically reflect the revision number (i.e. r1, r2).

Revise a Contribution type: NWI Proposal / Description

A NWI Proposal is revised when key elements change i.e. title, scope of work, Rapporteur, additional Supporting companies or schedule.

  • From the Contributions tab, identify the contribution to be revised and click on the glasses  XXXX    iconThe contribution details page will open.
  • Click on Revise
  • Update the fields in the General tab, if required (e.g. Meeting Allocation)
  • Open the WI Details tab to insert new information
  • Click on Save changes followed by Upload/make Available.

For help see Section 2.6

The contribution number will automatically reflect the revision number (i.e. r1, r2).

NOTE: The PWI number will also be revised.

Change the status "Available" of a Contribution - Introduction

To update the content of a Contribution which is currently in the status Available

  • Create a Revision of the Contribution via:

a) The Contributions tab

or

b) The Meetings tab

From the Contributions tab:

  • Identify the Contribution to be revised and click on the glasses        icon.

The General tab opens

  • Click Revise on the bottom of the screen
  • Update the fields (e.g. Meeting Allocation, Abstract)
  • Select the revised file to upload
  • Click on Save changes followed by Upload/Make Available

The contribution number will automatically reflect the revision number (i.e. r1, r2).

From the Meetings tab:

  • Identify the meeting that the contribution is attributed to
  • Click on the meeting hyperlink

The Meeting Information page opens.

  • Click on the link to List of xxx Contributions assigned to this meeting
  • Identify the Contribution to revise and click on the       icon.

The General tab opens

  • Click on Revise on the bottom of the screen
  • Update the fields (Meeting Allocation, Abstract)
  • Select the revised file to upload
  • Click on Save changes followed by Upload/Make Available

The Contribution number will automatically reflect the revision number (i.e. r1, r2).

A NWI Proposal is revised when key elements change i.e. title, scope of work, Rapporteur, additional Supporting companies or schedule.

  • From the Contributions tab, identify the contribution to be revised and click on the

glasses   XXXXX   icon

The contribution details page will open.

  • Click on Revise

Change the status of Contribution type: Other, Meeting Agenda, Meeting Report, Liaison Statements

Change the status of Contribution type: NWI Proposal / Description

Draft (of ETSI Standards) - Introduction

When creating the first version of a Draft

  • Download the deliverable templates from editHelp webpages
  • These are in MS Word and contain essential titles and text blocks.
  • Select the appropriate deliverable type (see ETSI Directives Technical Working Procedures (TWP) Annex A.3).

Find the templates for ETSI deliverables

There are 2 skeletons for each type of deliverable:

- one with explanatory text to guide rapporteurs

- one without the explanatory text.

NOTE:

If the intention is to revise an existing deliverable, download the latest published version in MS Word from the ETSI Work Programme on the portal.

Create a Contribution type: New Draft

There are 2 ways to upload a new version of a Draft deliverable:

- via the Contributions tab

- via the Drafts tab (see 5.7)

Contributions:

  • Select the Contributions tab
  • Click on New Draft in the dropdown menu

The Contribution Creation screen

opens in a new window on the General tab.

Add link to scenario 2/5.7 via the Latest Drafts tab?

New Draft - General tab

  • Complete the General tab

Title *: The system will use the title given in this field as the name of the uploaded file

Type *: New Draft is pre-selected

from Source *: By default the logged-in user

  • To modify the Source:
  • Click on Change (a pop-up Manage Source opens - see next page in this Helpfile by clicking on Next)

NOTE: mandatory fields are marked *.

4 different types of Source are available:

Organisation(s): Only active ETSI members/participants will be displayed

ETSI committee(s): Active ETSI Technical Body/Industry Specification Group/Working Group

Roles: Chairman, Vice Chairman, Secretary, Rapporteur, WG/TG Chairman, ETSI Secretariat, ETSI Director-General, Other

Other: Free text describing a role not matching one of the above categories

NOTE:

There can be more than one Source for a contribution (example: company A, company B, and company C, but all of the same type).

  • Use the Filter, the Add button and the Done button to select the appropriate criteria.

Main Contact *: By default logged user

Input for committee *: Automatically set, but can be changed to another TB / WG / ISG

Contribution for *: Decision, Discussion or Information

  • Select the appropriate one

Additional contact info: If applicable

Meeting – Allocation

  • Click on the Change to assign the contribution to a future meeting.
  • Follow the instructions in the blue text in the pop-up window and click on Done.

The system reverts to the contribution creation screen.

To remove a meeting allocation, click on the red cross Red Cross.png .

Contributions assigned to a meeting are then listed in the Meeting's Document list.

Draft tab

Next click on the Draft tab

WI Committee: Automatically set,

but can be changed to another TB / WG / ISG

WI Reference:

  • Choose an existing Draft version or upload a new one using the drop down menu

Version:

  • Upload a new one or choose an existing draft version
  • Click on Save changes

The system will confirm that the Contribution has been Reserved.

Create a cover page for type: New Draft

The cover page is the ID card of the contribution.

It retrieves the information from the General tab.

  • Click on Upload/Make available

There are 2 ways to proceed:

  • Either by requesting an automatically generated cover page
  • Or by selecting one in MS Word already saved on the pc.
  • The system will zip the cover page and Draft together
  • Click on Make available

Upload a New Draft

Main Contact *: By default logged user

Input for Committee *: Automatically set, but can be changed to another TB or WG or ISG

Contribution for *: Decision, Discussion or Information

  • Select the appropriate one

Additional contact info: If applicable

General tab

  • Complete the General tab

Title *: The system will use the title given in this

field as the name of the uploaded file

Type *: New Draft is pre-selected from Source *: By default the logged-in user

  • To modify from Source:

•Click on Change, a pop-up Manage Source opens

  • NOTE: Mandatory fields are marked with *.
  • 4 different types of Source are available:
  • Organization(s): Only active ETSI members/participants will be displayed

•ETSI committee(s): Active ETSI Technical Body/Industry Specification Group/Working Group

  • Role(s): Chairman, Vice Chairman, Secretary, Rapporteur, WG/TG Chairman, ETSI Secretariat, ETSI Director-General, Other
  • Other: Free text describing a role not matching one of the above categories

NOTE: There can be more than one Source for a contribution (example: company A, company B, and company C, but all of the same type).

Main Contact *: By default logged user

Input for Committee *: Automatically set, but can be changed to another TB or WG or ISG

Contribution for *: Decision, Discussion or Information

  • Select the appropriate one

Additional contact info: If applicable

Meeting – Allocation

  • Click on the Change to assign the contribution to a future meeting.
  • Follow the instructions in the blue text in the pop-up window and click on Done.

The system reverts to the contribution creation screen.

To remove a meeting allocation, click on the red cross Red Cross.png

Contributions assigned to a meeting are then listed in the Meeting's Document list.

Draft tab

  • Next click on the Draft tab

For information only since the Draft is already on the server the fields are pre-filled

  • Click on Save changes

The system displays a confirmation message Contribution has been Reserved.

Create a cover page for type: New Draft

The cover page is the ID card of the contribution.

It retrieves the information from the General tab.

  • Click on Upload/Make available

There are 2 ways to proceed:

  • Either by requesting an automatically generated cover page
  • Or by selecting one in MS Word already saved on the pc.
  • The system will zip the cover page and Draft together
  • Click on Make available

See terms and abbreviations

EDRs  ETSI Drafting Rules

EG  ETSI Guide

EN  European Standard

ENAP  EN Approval Procedure

EP  ETSI Project

EPP  ETSI Partnership Project

ES  ETSI Standard

EWP  ETSI Work Programme

GR  Group Report

GS  Group Specification

HS  Harmonised Standard

IPR  Intellectual Property Right

ISG  Industry Specification Group

MAP  Membership Approval Procedure

NSO  National Standards Organization

NWI  New Work Item

OCG  Operational Co-ordination Group

PAS  Publicly Available Specification

RoP  ETSI Rules of Procedure

SR  Special Report

STF  Special Task Force

TB  Technical Body

TC  Technical Committee

ToR  Terms of Reference

TR  Technical Report

TS  Technical Specification

TWPs  Technical Working Procedures

WG  Working Group

WI  Work Item