This tab displays the list of Active Work Items for a TB/Working Group, and their available drafts as uploaded by the rapporteurs.
The [Drafts] tab on ETSI portal displays the list of Active Work Items for a TB/Working Group, and their available drafts as uploaded by the rapporteurs.


A draft in this context is a specific version of document which has <u>not yet been approved</u> by the Technical Body (or ISG) and which relates to the content of an active work item.
A draft in this context is a specific version of document which has <u>not yet been approved</u> by the Technical Body (or ISG) and which relates to the content of an active work item.

Revision as of 16:49, 20 September 2017

The [Drafts] tab on ETSI portal displays the list of Active Work Items for a TB/Working Group, and their available drafts as uploaded by the rapporteurs.

A draft in this context is a specific version of document which has not yet been approved by the Technical Body (or ISG) and which relates to the content of an active work item.

Latest Draft Screen Content

The screen shows the list of active work items and their associated drafts.

LDportlet delegate mode.PNG

The first row displays the count of active and non published work items found for the selected Group (e.g. "9 active, non published WIs found, displaying 1 to 9").

Then for each Work Item:

  • The following icons:
    • The View details icon: links to the details of the Work Item record in the work programme database.
    • The Update icon: to upload a new draft, to update the status of the latest draft, or to change target dates.
    • The Manage upload path icon: for ETSI staff to manage drafts upload path and folders.
  • The Work Item reference number (e.g. "DTR/MTS-00114-1") followed by the ETSI publication number (when already assigned).
  • The list of available drafts (if any), with for each version:
    • The Contribute draft icon: to contribute it to its TB/Working Group for discussion, or decision.
    • The Delete draft icon: to delete a draft (feature only accessible to ETSI staff). This only appears next to drafts that have never been contributed, i.e. never submitted to a meeting as a contribution. Such non-contributed drafts may be deleted by ETSI staff.
    • The draft version, with a hyperlink to the draft file. To see previous versions, click on the Plus icon.PNG
    • Its associated status.
  • The second line displays the Work Item working title

Downloading drafts

When a draft has been uploaded for a work item, a download link is displayed under the version number. Login might be required to access the file.

Manage drafts

Uploading a new draft

After clicking on the Update icon icon, a pop-up will appear and prompt you for the following information:

  • The file to upload as latest draft
  • The version of the new draft (Vx.y.z) as it will appear on the portal
  • The new maturity status of the uploaded draft (early, stable, final).
  • Comments (optional)

Note also that the pop-up allows you to perform other tasks like:

  • Changing the maturity status of the last uploaded draft (eg: from stable to final)
  • Managing (changing) target dates for the Work Item milestones (depending on your role and access rights).

Upon successful upload, the confirmation window will display the path and filename of the uploaded draft and prompt the user to CONTRIBUTE the draft on-the-fly, i.e. to encapsulate the draft in a contribution and to make it available to the (Working-)Group as a meeting contribution.

Draft upload confirmation.png

Contributing a draft (more details here) can also be done later, by clicking on the Contribute draft icon next to a draft version.

After upload, the Work Item schedule in the workprogramme database gets updated : the "achieved date" for the selected maturity milestone is filled with the draft upload date and version. Any subsequent new version upload for the same maturity milestone will generate the insertions of a new line in the Work Item schedule with relevant achieved date and version.

Note: the upload facility is disabled for the work items that are under TB Approval or TB resolution, they are "Frozen". The Update icon icon appears only for logged users who have upload rights.

Manage drafts

Changing the status of an available draft

When clicking on the Update icon icon, the upload pop-up will also allow some users (depending on their access rights) to update the maturity status of the last uploaded draft (eg: from Stable to Final draft).

When changing the status of an existing draft version, it is necessary to provide the following information:

  • targeted maturity milestone of the updated draft version
  • Comments (optional)

In the Work Programme schedule database, the corresponding achieved date for the targeted milestone is then updated with the current date.

If the targeted maturity milestone has already been marked as achieved, then a new schedule line is inserted with relevant achieved date and version.

Managing target dates for Work Item milestones

Only rapporteurs and Officials have the rights to modify the target dates of their Work Items. Rapporteurs can update target dates for maturity milestones, i.e. the “early draft”, “Stable Draft”, and “Final draft” target dates. Additionally, officials (Chair and Vice-Chairs) have the right to update the decision milestones: "WG approval", and "TB approval".

To do so click on the Update icon icon (same icon as to upload a new draft).

Then, from the the Manage drafts pop-up, click on the Manage target dates button

Manage drafts.png

A second pop-up window will open:

Manage target dates.png

The system will then let the user enter and save new target dates dates for the milestones.