Remote Consensus(OLD): Difference between revisions

From Help
No edit summary
m (Mangion moved page Remote Consensus to Remote Consensus(OLD))
 
(102 intermediate revisions by 5 users not shown)
Line 1: Line 1:
==Scope of the Remote Consensus Application==
==Scope of the Remote Consensus Application==


This new application aims at providing a simple tool to collect comments and measure consensus during an approval period on contributions for which decision is to be taken online instead of during a face-to face meeting.
This application aims at providing a comprehensive online tool to collect comments and measure consensus for contributions during given period as opposed to during a face-to face meeting.
This application will hence focus on:
This application focuses on:


- The collection of members views recorded as ‘’comments’’, and the ability to present these comments in clear reports.
- The collection of members views recorded as ''comments'', and the ability to present these comments in clear reports.


- The measurement of consensus by accounting the number of ‘’oppositions’’ raised during the approval period and maintained by its author at the end of that period
- The measurement of consensus by counting the number of ‘’oppositions’’ raised during the approval period and maintained by its author at the end of that period


- The final interpretation of the consensus stays within the chairman’s responsibility. After the end of the consensus measurement period, the chairman of the TB/WG/TG will take the final decision and ratify it.
- The final interpretation of the consensus is the responsibility of chairman. After the end of the consensus measurement period, the chairman of the TB/WG/TG will take the final decision on contribution(s) and ratify the remote consensus.


The announcement of remote consensuses measuring period, and the results will be disseminated on the TB mailing list by the system.
The announcement of remote consensuses measuring period, and the results are disseminated on the TB mailing list by the system.


NOTE: It is recommended to group contributions in one Remote consensus on which decision needs to be taken. 
One of this application aim is to help TBs to structure and organize their work between meetings: TBs would group their  documents for remote decisions in one or two RCs per month for instance.
Normally, a Remote Consensus is planned well before it starts, and delegates can add their documents to the RC by themselves. Then the Remote Consensus starts, and no more than ONE notification per week is sent to the mailing list.


==Create a New Remote Consensus==
==Create a new Remote Consensus==


'''Actors''': TB/WG/TG Chairman, Vice-Chairman and Secretary; TB support staff
'''Actors''': TB/WG/TG Chairman, Vice-Chairman and Secretary; TB support staff


Note: Officials can create RC only for the TB he chairs and also for its WGs.  
Note: Only Officials can create a Remote Consensus for the TB he chairs and also for its WGs.  


In order to be able to create a remote consensus you first need to be logged in to the portal. Click on the ‘’create new’’ link in the portlet.
In order to be able to create a remote consensus you first need to be logged in to the portal. Click on the ‘’create new’’ link in the portlet.
The following creation screen is displayed:
The following creation screen is displayed:


[[File:Create_a_RC.png|450px]]
[[File:Create_a_RC.png|450px|center]]


The system displays an empty form which you are asked to fill in. Some of the attributes are mandatory:
The system displays an empty form which you are asked to fill in. Some of the attributes are mandatory:


- '''Community''': the system pre-filled the community from where you come from which you can change
- '''Community''': this field automatically shows your TB/WG, however it is possible to change to another


- '''Type''': There are 2 types of Remote consensus:
- '''Type''': There are 2 types of Remote Consensus:


1) Consensus measuring – DEC: This type of Remote Consensus allows the measurement of consensus by accounting the number of ‘’oppositions’’ raised during the approval period and maintained by its author at the end of that period
1) '''''Consensus measuring "– DEC"''''': This type of Remote Consensus allows the measurement of consensus by counting the number of ‘’oppositions’’ raised during the approval period and maintained by its author at the end of that period


2) Comment collecting – DIS: This type of Remote Consensus allows the collection of members views recorded as ‘’comments’’, and the ability to present these comments in clear reports.
2)'' '''Comment collecting "– DIS"''''': This type of Remote Consensus allows the collection of members views recorded as ‘’comments’’, and the ability to present these comments in clear reports.


- '''Description''': You can type text to give information on the Remote consensus you intend to create. This field is optional.
- '''Description''': You can type text to give information on the Remote Consensus you intend to create. This field is optional.


- '''Status''': In creation mode the status ‘’PLANNED’’ is automatically set and cannot be changed
- '''Status''': In creation mode the status ‘’PLANNED’’ is automatically set and cannot be changed


- '''Start date''': Select the date when the remote consensus will start and comments will be allowed. Start time will always be 12:00 CET.
- '''Start date''': Select the date when the Remote Consensus will start and therefore comments will be allowed. '''Start time will always be 12:00 CET.'''
Note: Start Date must be greater than NOW, greater than FREEZE DATE and smaller than END DATE.
Note: Start Date must be greater than Now, greater than Freeze date and smaller than End date.


- '''End Date''':  Select the date when the remote consensus will end and comments will not be allowed anymore. End Time will always be midnight CET.  
- '''End Date''':  Select the date when the Remote Consensus will end and when comments will not be longer be allowed. '''End Time will always be midnight CET.'''
Note: End Date must be greater than START DATE
Note: End Date must be greater than Start date.


- '''Freeze Date''': Should you wish to, you can set a freeze date for contribution submission. This means that TC members will not be able to add contribution to a Planned Remote consensus at the freeze date.  If selected, this date must be greater than Now and smaller than the Start Date.   
- '''Freeze Date''': Should you wish to, you can set a freeze date for contribution submission. This means that TC members will not be able to add a contribution to a Planned Remote Consensus from the freeze date.  If selected, this date must be greater than Now and smaller than the Start date.   


-'''Status Report Date''': Status Report are sent for every Remote consensus on Fridays at 4:00 a.m CET, but this box gives you the possibility to change the day of the status report send.  
-'''Status Report Date''': This indicates if a weekly status report shall be sent for this Remote Consensus. If this option is ticked then the system asks you to indicate which day this Report shall be sent to the list.  




When all mandatory fields are filled, click on the button ‘’SAVE’’. The system displays a creation confirmation pop-up summarising the Remote consensus properties and the Remote Consensus portlet is refreshed with the newly created item.
When all mandatory fields are filled, click on the button ‘’Save’’. The system displays a creation confirmation pop-up summarising the Remote Consensus properties and the Remote Consensus portlet is refreshed with the newly created item.


==Update the details of a Remote Consensus==
'''Actors''': TB/WG/TG Chairman, Vice-Chairman and Secretary; TB support staff
To update properties of remote consensus, go to the Remote Consensus portlet and click on the [[File:Portlet_view_details.png|15px]] on the line of the Remote Consensus you intend to update.


The system displays the detailed view for the chosen Remote Consensus


==Update the details of a Remote Consensus==


'''Actors''': TB/WG/TG Chairman, Vice-Chairman and Secretary; TB support staff
[[File:RC_view_details.jpg|450px]]


To update properties of remote consensus, go to the Remote Consensus portlet and click on the [[File:Portlet_view_details.png|15px]] on the line of the RC you intend to update.


The system displays the detailed view for the chosen RC, click on the Edit button and update the RC information. Ensure that you don’t leave a mandatory field blank.  
Then, click on the "Edit" button and update the Remote Consensus information. Ensure that you don’t leave a mandatory field blank.  


Note: You can decide to change the status from PLANNED to FROZEN manually on this page.  
Note: You can decide to change the status from PLANNED to FROZEN manually on this page.  


The FROZEN status can be used should you wish to stop the addition of contribution in a Remote Consensus; the reason for freezing a RC may be that you are in line with what you were expected for this RC or that you need to check the added contributions.  
The FROZEN status can be used should you wish to stop the addition of contribution in a Remote Consensus; the reason for freezing a Remote Consensus may be that you are in line with what you were expected for this Remote Consensus or that you need to check the added contributions.  
 
The FROZEN status can be removed manually by changing the status from FROZEN to PLANNED in the status drop down menu otherwise it will be changed automatically by the system at the Start date of the Remote Consensus.
 
When you have finished updating the Remote Consensus properties, click on the ‘’SAVE’’ button. The system updates the information and refreshes the Remote Consensus portlet.
 
==Add contributions to a Remote Consensus==
 
'''Actors''': TB Membership list member, TB/WG/TG Chairman, Vice-Chairman and Secretary, TB support staff
 
Access rights note: You need to subscribe to the TB membership list to be able to use the Remote Consensus application. Should you wish to subscribe please go to:[http://webapp.etsi.org/TBMembershipList]
 
===Add contribution(s) to a Remote Consensus from the Remote Consensus creation screen===
 
After saving your newly created Remote Consensus, click on "Add contributions" link:
 
[[File:Add_contrib_from_RC_creation.png|500px]]
 
The system displays a pop-up window with a search box for contributions:
 
[[File:Pop-up_add_contrib_to_RC.png|550px]]
 
 
You may search with the contribution Unique Identifying number (UID).
Note: This field does not contain a wildcard function. You will need to include the zeros contained in the UID. For example: ERM(13)'''000'''025.
 
You may also search by keywords in the contribution title.
If you do not know the UID nor the title, just click on "Filter".
 
Contributions are taken from the same community as the Remote Consensus and not from its subgroups.
 
 
To add contributions to a Remote Consensus, select one or several contributions in the filtered list and click on the “Add” button, or double-click on a single contribution and click on “Done” once you have added all your contributions.
 
You can also add contributions from the Remote Consensus detailed view, by clicking on the [[File:Portlet_view_details.png|15px]] and select the “Add contribution”. The system will redirect to the contributions window above.
 
 
===Add contribution(s) to a Remote Consensus from the Remote Consensus portlet===
 
The remote consensuses are listed in the Remote Consensus portlet. A remote consensus that can still accept contribution addition (i.e. a "planned" RC) will show a small [[File:Add_contrib_from_portlet.png|20px]] icon.
 
To add contribution(s) to such a Remote Consensus, click on the [[File:Add_contrib_from_portlet.png|20px]] icon.
 
The system displays a pop-up window with a search box for contributions:
 
[[File:Pop-up_add_contrib_to_RC.png|550px]]
 
From this step onwards, you can refer to the above paragrah "Adding a contribution from the Remote Consensus creation screen".
 
===Add contribution(s) to a Remote Consensus from the contribution application===
 
Context: You are logged in and a list of contribution(s)is diplayed
 
To add a contribution to a Remote Consensus, select it in the contributions list and then click on the "Actions button" in the top bar. The “Actions” button unfolds and displays the menu of actions that you can perform on this contribution, including those related to Remote Consensus.
 
Click on "Remote Consensus", then "Send to Remote Consensus".
 
The system then displays a listing of the Remote Consensuses in “PLANNED” or “FROZEN” status of the contribution's community. Select the Remote Consensus to which you wish to add the selected contribution.
 
[[File:Add_contrib_in_RC_from_Contrib.png|550px]]
 
 
The system then displays the message: Your contribution has been added to the chosen Remote Consensus.
 
 
'''Important Note:'''
 
'''- Contributions uploaded for Information/Discussion may only be added to Remote Consensus Type DIS: “Comments Collecting”.'''
 
'''- Contributions uploaded for Decision may only be added to Remote Consensus Type DEC: “Consensus Measuring”.'''
 
 
Note: Contributions added to a remote consensus are locked in the contribution application and this lock is visually materialized by the following icon: [[File:Hammer.png|20px]].
It is not possible to perform actions on this contribution during the Remote Consensus, such as changing the status or uploading a revision.
 
==Status of contribution in a Remote Consensus==


The FROZEN status can be removed manually by changing the status from FROZEN to PLANNED in the status drop down menu otherwise it will be changed automatically by the system at the start Date of the Remote Consensus.  
You can add one or more contributions that are in Status “Reserved” or “Available” to a Remote Consensus. From the Remote Consensus portlet, the system only displays only contributions which can be added to the Remote Consensus you have selected.  


When you have finished to update the RC properties, click on the ‘’SAVE’’ button. The system updates the info and refreshes the RC portlet.
* Remote Consensus of Type '''consensus measuring''': you can add to this type of Remote Consensus only '''contributions which are for Decision.'''


* Remote Consensus of Type '''comment collecting''': you can add to this type of Remote Consensus only '''contributions which are for Discussion.'''


==Add Contributions to a Remote Consensus from the Contribution application==
The contribution in a Remote Consensus which has not yet started has the status “ADDED” in a Remote Consensus.
 
 
Once the Remote Consensus has started:
* The contributions in '''status “AVAILABLE”''' in the contribution process '''will be set to “ACTIVE”''' in the Remote Consensus. Note: This “ACTIVE” Contribution is still available on the server but locked in the contribution process as it is in Remote Consensus.
 
 
* The contributions in '''status “RESERVED”''' in the contribution process '''will be set to “NO SHOW”''' in the Remote Consensus. Note: This “NO SHOW” Contribution is still in a “RESERVED” status in the contribution application and can eventually be added to another Remote Consensus in “RESERVED” or “AVAILABLE” status.
 
 
* If the Remote Consensus contains '''only contributions with status "RESERVED"''', then the Remote Consensus '''will be set to "CANCELLED"''' and the contributions will be released for a future Remote Consensus.
 
:: NOTE: The history tab of the contributions keeps track of the differents steps and events.
 
==Remove contributions from a Remote Consensus==
 
'''Actors''': TB/WG/TG Chairman, Vice-Chairman and Secretary; TB support staff. The TB Membership list Members can remove a contribution only when the Remote Consensus is in a PLANNED Status.
 
A contribution can be removed from a PLANNED Remote Consensus by any user who has added it. Nevertheless, if a Remote Consensus has STARTED then only the TB/WG/TG Chairman and Vice-Chairman can remove it from the Remote Consensus.
 
You can remove the contribution by clicking on the “view details” of the contribution, the system will open the usual contribution detailed view, select the tab “Remote Consensus” and click on the link “remove”.
 
[[File:Contrib_details_remove.png|550px|center]]
 
 
NOTE: The contribution removed from an active Remote Consensus will be noted as "ABORTED".
 
==Post a comment on a contribution in a Remote Consensus==


'''Actors''': TB Membership list member, TB/WG/TG Chairman, Vice-Chairman and Secretary, TB support staff
'''Actors''': TB Membership list member, TB/WG/TG Chairman, Vice-Chairman and Secretary, TB support staff


Access rights note: You need to subscribe to the TB membership list in order to be able to use the Remote Consensus application. Should you wish to subscribe please go to:[http://webapp.etsi.org/TBMembershipList]
'''Context''': You are in the contribution application. You see the list of contributions that are on Remote Consensus.
 
 
To add a comment on a contribution in a Remote Consensus, proceed as follows:
*Open the contribution detailed view,
*Select the ‘’Remote Consensus’’ tab from the contribution detailed view,
*Type your comment in the comment text box at the bottom of the screen
*Save your comment by clicking on the ‘’Save’’ button that will appear.
 
 
[[File:Comment_window.png|550px]]
 
The action of commenting to a contribution in a Remote Consensus will automatically subscribe you to notifications, this means that you will receive email notifications each time a comment (or an opposition) is raised on the contribution (you have the ability to unsubscribe to notifications by either clicking on the link ‘’Stop Monitoring’’).
 
[[Note]]: Attaching a file to a comment is not possible, yet it is possible to refer to an uploaded contribution from within a comment.
 
[[Note]]: In a Remote Consensus for DECision, raising a comment without opposing to the RC means that the author of the comment does not oppose to the document being approved as-it-is (i.e. without taking the comment into account).
 
* If a comment in an RC requests '''editorial changes''' on a draft, these may be taken into account before publication.
* If a comment in an RC requests '''technical changes''' on a draft, these cannot implemented in the draft before publication without re-approving the updated draft.
** if no opposition is raised during the RC, the technical changes may be dropped and the draft published unchanged.
** if an opposition is raised during the RC, the current version is not approved, a new version of the draft may be generated and a approved in a future RC
 
==Oppose to a contribution in a Remote Consensus (only for RC type "-DEC")==
 
'''Actors''': TB Membership list member, TB/WG/TG Chairman, Vice-Chairman and Secretary, TB support staff
 
 
You can indicate your wish to oppose to a contribution in a remote consensus by selecting the action ‘’Raise an Opposition’’ from the ‘’Remote Consensus’’ tab of the contribution detailed view.
 
[[File:Raise_opposition.png|550px]]
 
 
When you raise an opposition, you are asked to enter justification comment. A red bullet appears next to your comment and the general information panel at the top of the pop-up indicates then that CONSENSUS= NO and the counter of the number of opposition is refreshed.
 
Only one opposition per delegate can be posted. As soon as you raise your opposition the action becomes ‘’Clear my opposition’’ which you can use at any time to remove your opposition on a contribution.
 
==Ratify contribution in a Remote Consensus==
'''Actors''': TB/WG/TG Chairman, Vice-Chairman and Secretary
 
When the Remote Consensus End Date is reached, then the Remote consensus passes in status ‘’TO BE RATIFIED’’. It is no longer possible to comment or to raise oppositions. The TB/WG/TG chairman, Vice Chairman or Secretary decides on the final result of the Remote Consensus for a particular contribution. This result will update the status of the contribution accordingly.
 
You can indicate your wish to ratify a contribution in a remote consensus by selecting the action ‘’Ratify’’ from the ‘’Remote Consensus’’ tab of the contribution detailed view.
 
Then the following screen is displayed:
 
[[File:Ratification.png|550px]]
 
On this screen you are asked to indicate the result status of the contribution.  
 
'''If the Remote Consensus type is Consensus Measuring ("-DEC")''', then the system displays the following possible status:
 
::- ACCEPTED
 
::- REJECTED
 
::- NOTED
 
::- NOTED with revision requested
 
::- NOTED with revision pre-approved
::: '' Important: with this status, the next uploaded revision will be '''automatically "ACCEPTED"''' as the revision was pre-approved.
 
 
'''If the Remote Consensus type is Comment Collecting ("-DIS")''', then the system displays the following possible status:
 
::- AVAILABLE (which would allow you to add the contribution to another Remote Consensus)
 
::- NOTED
 
::- NOTED with revision requested


Context: You are logged in and on a list of contribution(s)
::- NOTED with revision pre-approved


You can indicates to the system that you intend to add a contribution to a RC by clicking on the “MORE” button on the line of the contribution you intend to add. The “MORE” button unfolds and displays the menu of actions that you can perform on this contribution, including the new actions related to Remote Consensus.  
After having indicated the result status of the contribution you may add a ratification comment in the text box at the bottom of the window. This ratification comment is not mandatory unless the output status of the contribution is ‘’REJECTED’’.


The system displays then a submenu listing the Remote Consensuses in “PLANNED” or “FROZEN” status for the community to which the contribution belongs. Select the Remote Consensus to which you want to add the selected contribution.
Note: A TB official can decide to ACCEPT a contribution even if consensus was not reached
Your contribution has been added to the chosen Remote Consensus.


This action can also be performed on multiple contributions using the top bar “MORE” button.  
A ratified contribution is then unlocked in the contribution application.  


Note:  Remote Consensuses for which the RCType is not compatible with the ContribFor field are displayed in grey and cannot be selected (example: a contribution For Decision cannot be added to a RC of type DIS “Comments Collecting”).
After the last contribution in a Remote Consensus has been ratified then the remote consensus is set to ‘’RATIFIED’’.


The remote consensuses are listed in the RC portlet, in order to add contribution(s) to one of the available RC, click on the [[File:Add_contrib_from_portlet.png|20px]] icon.
== How to identify a contribution under Remote Consensus ==


The system displays a pop-up window with a search box for contributions. This window will allow the addition of filtered contribution=s taken from the same community as the RC and not from its subgroups.


In the list of filtered contribution, the system only shows contributions that are eligible for this Remote Consensus.  
The contributions added to a Remote Consensus are flagged with a little hammer icon.
This icon is visible in the Contribution applications:
:[[File: Hammer_active.png|30px]] when the contribution is ADDED or ACTIVE in a Remote consensus which is in PLANNED, FROZEN, STARTED status.
:[[File:Hammer_ratified.png|30px]] when the contribution has been RATIFIED or REVIEWED in the latest remote consensus it’s been in.


In order to add contributions to a RC, select one or several contributions in the filtered list and click on the “ADD” button, or by double-clicking on a single contribution and finish the action by clicking on “DONE”.  
:[[File:Hammer_aborted.png|30px]] when the contribution is in status ABORTED in the latest remote consensus it’s been in.
===In the Contributions application ===
[[File: Hammer_icon_in_Contrib_example1.png|700px]]
[[File:Hammer_icon_in_Contrib_example2.png|700px]]


You can also add contributions from the RC detailed view, by click on the [[File:Portlet_view_details.png|15px]]and select the “add contribution” then the system displays the add contributions window.
=== In the contribution details page ===
The hammer is visible next to the UID number on the details page:
[[File:Contrib_details_page_with_hammer.png|500px]]

Latest revision as of 10:33, 18 December 2018

Scope of the Remote Consensus Application

This application aims at providing a comprehensive online tool to collect comments and measure consensus for contributions during given period as opposed to during a face-to face meeting. This application focuses on:

- The collection of members views recorded as comments, and the ability to present these comments in clear reports.

- The measurement of consensus by counting the number of ‘’oppositions’’ raised during the approval period and maintained by its author at the end of that period

- The final interpretation of the consensus is the responsibility of chairman. After the end of the consensus measurement period, the chairman of the TB/WG/TG will take the final decision on contribution(s) and ratify the remote consensus.

The announcement of remote consensuses measuring period, and the results are disseminated on the TB mailing list by the system.

NOTE: It is recommended to group contributions in one Remote consensus on which decision needs to be taken. One of this application aim is to help TBs to structure and organize their work between meetings: TBs would group their documents for remote decisions in one or two RCs per month for instance. Normally, a Remote Consensus is planned well before it starts, and delegates can add their documents to the RC by themselves. Then the Remote Consensus starts, and no more than ONE notification per week is sent to the mailing list.

Create a new Remote Consensus

Actors: TB/WG/TG Chairman, Vice-Chairman and Secretary; TB support staff

Note: Only Officials can create a Remote Consensus for the TB he chairs and also for its WGs.

In order to be able to create a remote consensus you first need to be logged in to the portal. Click on the ‘’create new’’ link in the portlet. The following creation screen is displayed:

Create a RC.png

The system displays an empty form which you are asked to fill in. Some of the attributes are mandatory:

- Community: this field automatically shows your TB/WG, however it is possible to change to another

- Type: There are 2 types of Remote Consensus:

1) Consensus measuring "– DEC": This type of Remote Consensus allows the measurement of consensus by counting the number of ‘’oppositions’’ raised during the approval period and maintained by its author at the end of that period

2) Comment collecting "– DIS": This type of Remote Consensus allows the collection of members views recorded as ‘’comments’’, and the ability to present these comments in clear reports.

- Description: You can type text to give information on the Remote Consensus you intend to create. This field is optional.

- Status: In creation mode the status ‘’PLANNED’’ is automatically set and cannot be changed

- Start date: Select the date when the Remote Consensus will start and therefore comments will be allowed. Start time will always be 12:00 CET. Note: Start Date must be greater than Now, greater than Freeze date and smaller than End date.

- End Date: Select the date when the Remote Consensus will end and when comments will not be longer be allowed. End Time will always be midnight CET. Note: End Date must be greater than Start date.

- Freeze Date: Should you wish to, you can set a freeze date for contribution submission. This means that TC members will not be able to add a contribution to a Planned Remote Consensus from the freeze date. If selected, this date must be greater than Now and smaller than the Start date.

-Status Report Date: This indicates if a weekly status report shall be sent for this Remote Consensus. If this option is ticked then the system asks you to indicate which day this Report shall be sent to the list.


When all mandatory fields are filled, click on the button ‘’Save’’. The system displays a creation confirmation pop-up summarising the Remote Consensus properties and the Remote Consensus portlet is refreshed with the newly created item.

Update the details of a Remote Consensus

Actors: TB/WG/TG Chairman, Vice-Chairman and Secretary; TB support staff

To update properties of remote consensus, go to the Remote Consensus portlet and click on the Portlet view details.png on the line of the Remote Consensus you intend to update.

The system displays the detailed view for the chosen Remote Consensus


RC view details.jpg


Then, click on the "Edit" button and update the Remote Consensus information. Ensure that you don’t leave a mandatory field blank.

Note: You can decide to change the status from PLANNED to FROZEN manually on this page.

The FROZEN status can be used should you wish to stop the addition of contribution in a Remote Consensus; the reason for freezing a Remote Consensus may be that you are in line with what you were expected for this Remote Consensus or that you need to check the added contributions.

The FROZEN status can be removed manually by changing the status from FROZEN to PLANNED in the status drop down menu otherwise it will be changed automatically by the system at the Start date of the Remote Consensus.

When you have finished updating the Remote Consensus properties, click on the ‘’SAVE’’ button. The system updates the information and refreshes the Remote Consensus portlet.

Add contributions to a Remote Consensus

Actors: TB Membership list member, TB/WG/TG Chairman, Vice-Chairman and Secretary, TB support staff

Access rights note: You need to subscribe to the TB membership list to be able to use the Remote Consensus application. Should you wish to subscribe please go to:[1]

Add contribution(s) to a Remote Consensus from the Remote Consensus creation screen

After saving your newly created Remote Consensus, click on "Add contributions" link:

Add contrib from RC creation.png

The system displays a pop-up window with a search box for contributions:

Pop-up add contrib to RC.png


You may search with the contribution Unique Identifying number (UID). Note: This field does not contain a wildcard function. You will need to include the zeros contained in the UID. For example: ERM(13)000025.

You may also search by keywords in the contribution title. If you do not know the UID nor the title, just click on "Filter".

Contributions are taken from the same community as the Remote Consensus and not from its subgroups.


To add contributions to a Remote Consensus, select one or several contributions in the filtered list and click on the “Add” button, or double-click on a single contribution and click on “Done” once you have added all your contributions.

You can also add contributions from the Remote Consensus detailed view, by clicking on the Portlet view details.png and select the “Add contribution”. The system will redirect to the contributions window above.


Add contribution(s) to a Remote Consensus from the Remote Consensus portlet

The remote consensuses are listed in the Remote Consensus portlet. A remote consensus that can still accept contribution addition (i.e. a "planned" RC) will show a small Add contrib from portlet.png icon.

To add contribution(s) to such a Remote Consensus, click on the Add contrib from portlet.png icon.

The system displays a pop-up window with a search box for contributions:

Pop-up add contrib to RC.png

From this step onwards, you can refer to the above paragrah "Adding a contribution from the Remote Consensus creation screen".

Add contribution(s) to a Remote Consensus from the contribution application

Context: You are logged in and a list of contribution(s)is diplayed

To add a contribution to a Remote Consensus, select it in the contributions list and then click on the "Actions button" in the top bar. The “Actions” button unfolds and displays the menu of actions that you can perform on this contribution, including those related to Remote Consensus.

Click on "Remote Consensus", then "Send to Remote Consensus".

The system then displays a listing of the Remote Consensuses in “PLANNED” or “FROZEN” status of the contribution's community. Select the Remote Consensus to which you wish to add the selected contribution.

Add contrib in RC from Contrib.png


The system then displays the message: Your contribution has been added to the chosen Remote Consensus.


Important Note:

- Contributions uploaded for Information/Discussion may only be added to Remote Consensus Type DIS: “Comments Collecting”.

- Contributions uploaded for Decision may only be added to Remote Consensus Type DEC: “Consensus Measuring”.


Note: Contributions added to a remote consensus are locked in the contribution application and this lock is visually materialized by the following icon: Hammer.png. It is not possible to perform actions on this contribution during the Remote Consensus, such as changing the status or uploading a revision.

Status of contribution in a Remote Consensus

You can add one or more contributions that are in Status “Reserved” or “Available” to a Remote Consensus. From the Remote Consensus portlet, the system only displays only contributions which can be added to the Remote Consensus you have selected.

  • Remote Consensus of Type consensus measuring: you can add to this type of Remote Consensus only contributions which are for Decision.
  • Remote Consensus of Type comment collecting: you can add to this type of Remote Consensus only contributions which are for Discussion.

The contribution in a Remote Consensus which has not yet started has the status “ADDED” in a Remote Consensus.


Once the Remote Consensus has started:

  • The contributions in status “AVAILABLE” in the contribution process will be set to “ACTIVE” in the Remote Consensus. Note: This “ACTIVE” Contribution is still available on the server but locked in the contribution process as it is in Remote Consensus.


  • The contributions in status “RESERVED” in the contribution process will be set to “NO SHOW” in the Remote Consensus. Note: This “NO SHOW” Contribution is still in a “RESERVED” status in the contribution application and can eventually be added to another Remote Consensus in “RESERVED” or “AVAILABLE” status.


  • If the Remote Consensus contains only contributions with status "RESERVED", then the Remote Consensus will be set to "CANCELLED" and the contributions will be released for a future Remote Consensus.
NOTE: The history tab of the contributions keeps track of the differents steps and events.

Remove contributions from a Remote Consensus

Actors: TB/WG/TG Chairman, Vice-Chairman and Secretary; TB support staff. The TB Membership list Members can remove a contribution only when the Remote Consensus is in a PLANNED Status.

A contribution can be removed from a PLANNED Remote Consensus by any user who has added it. Nevertheless, if a Remote Consensus has STARTED then only the TB/WG/TG Chairman and Vice-Chairman can remove it from the Remote Consensus.

You can remove the contribution by clicking on the “view details” of the contribution, the system will open the usual contribution detailed view, select the tab “Remote Consensus” and click on the link “remove”.

Contrib details remove.png


NOTE: The contribution removed from an active Remote Consensus will be noted as "ABORTED".

Post a comment on a contribution in a Remote Consensus

Actors: TB Membership list member, TB/WG/TG Chairman, Vice-Chairman and Secretary, TB support staff

Context: You are in the contribution application. You see the list of contributions that are on Remote Consensus.


To add a comment on a contribution in a Remote Consensus, proceed as follows:

  • Open the contribution detailed view,
  • Select the ‘’Remote Consensus’’ tab from the contribution detailed view,
  • Type your comment in the comment text box at the bottom of the screen
  • Save your comment by clicking on the ‘’Save’’ button that will appear.


Comment window.png

The action of commenting to a contribution in a Remote Consensus will automatically subscribe you to notifications, this means that you will receive email notifications each time a comment (or an opposition) is raised on the contribution (you have the ability to unsubscribe to notifications by either clicking on the link ‘’Stop Monitoring’’).

Note: Attaching a file to a comment is not possible, yet it is possible to refer to an uploaded contribution from within a comment.

Note: In a Remote Consensus for DECision, raising a comment without opposing to the RC means that the author of the comment does not oppose to the document being approved as-it-is (i.e. without taking the comment into account).

  • If a comment in an RC requests editorial changes on a draft, these may be taken into account before publication.
  • If a comment in an RC requests technical changes on a draft, these cannot implemented in the draft before publication without re-approving the updated draft.
    • if no opposition is raised during the RC, the technical changes may be dropped and the draft published unchanged.
    • if an opposition is raised during the RC, the current version is not approved, a new version of the draft may be generated and a approved in a future RC

Oppose to a contribution in a Remote Consensus (only for RC type "-DEC")

Actors: TB Membership list member, TB/WG/TG Chairman, Vice-Chairman and Secretary, TB support staff


You can indicate your wish to oppose to a contribution in a remote consensus by selecting the action ‘’Raise an Opposition’’ from the ‘’Remote Consensus’’ tab of the contribution detailed view.

Raise opposition.png


When you raise an opposition, you are asked to enter justification comment. A red bullet appears next to your comment and the general information panel at the top of the pop-up indicates then that CONSENSUS= NO and the counter of the number of opposition is refreshed.

Only one opposition per delegate can be posted. As soon as you raise your opposition the action becomes ‘’Clear my opposition’’ which you can use at any time to remove your opposition on a contribution.

Ratify contribution in a Remote Consensus

Actors: TB/WG/TG Chairman, Vice-Chairman and Secretary

When the Remote Consensus End Date is reached, then the Remote consensus passes in status ‘’TO BE RATIFIED’’. It is no longer possible to comment or to raise oppositions. The TB/WG/TG chairman, Vice Chairman or Secretary decides on the final result of the Remote Consensus for a particular contribution. This result will update the status of the contribution accordingly.

You can indicate your wish to ratify a contribution in a remote consensus by selecting the action ‘’Ratify’’ from the ‘’Remote Consensus’’ tab of the contribution detailed view.

Then the following screen is displayed:

Ratification.png

On this screen you are asked to indicate the result status of the contribution.

If the Remote Consensus type is Consensus Measuring ("-DEC"), then the system displays the following possible status:

- ACCEPTED
- REJECTED
- NOTED
- NOTED with revision requested
- NOTED with revision pre-approved
Important: with this status, the next uploaded revision will be automatically "ACCEPTED" as the revision was pre-approved.


If the Remote Consensus type is Comment Collecting ("-DIS"), then the system displays the following possible status:

- AVAILABLE (which would allow you to add the contribution to another Remote Consensus)
- NOTED
- NOTED with revision requested
- NOTED with revision pre-approved

After having indicated the result status of the contribution you may add a ratification comment in the text box at the bottom of the window. This ratification comment is not mandatory unless the output status of the contribution is ‘’REJECTED’’.

Note: A TB official can decide to ACCEPT a contribution even if consensus was not reached

A ratified contribution is then unlocked in the contribution application.

After the last contribution in a Remote Consensus has been ratified then the remote consensus is set to ‘’RATIFIED’’.

How to identify a contribution under Remote Consensus

The contributions added to a Remote Consensus are flagged with a little hammer icon.

This icon is visible in the Contribution applications:

Hammer active.png when the contribution is ADDED or ACTIVE in a Remote consensus which is in PLANNED, FROZEN, STARTED status.
Hammer ratified.png when the contribution has been RATIFIED or REVIEWED in the latest remote consensus it’s been in.
Hammer aborted.png when the contribution is in status ABORTED in the latest remote consensus it’s been in.


In the Contributions application

Hammer icon in Contrib example1.png


Hammer icon in Contrib example2.png


In the contribution details page

The hammer is visible next to the UID number on the details page:


Contrib details page with hammer.png