Latest Drafts

From Help

This portlet displays the list of Active Work Items for a TB/Working Group, and their available drafts as uploaded by the rapporteurs.

A draft in this context is a specific document which is related to an individual active and non published work item. All other versions of a latest draft (PE, OAP, Vote, etc.) are available from the Publication service.

Description of the Screen Content

The screen shows the list of active work items and their associated drafts.


The first row shows the count of active, non published work items found for the selected Group (e.g. "43 active, non published WIs found, displaying 1 to 30").

Then for each Work Item:

  • The following icons:
    • The Glasses icon icon: links to the details of the Work Item record in the work programme database.
    • The Update icon icon to update and manage the drafts: upload of a new draft, update the status of the latest draft, change target dates, etc... access to these functionalities depend on user's access rights.
    • The Star icon icon: to allow ETSI staff to manage drafts upload path and folders.
  • The Work Item reference number (e.g. "DTR/MTS-00114-1") followed by the ETSI publication number (when already assigned).
  • The working title in a second line.
  • The list of the available drafts, with for each version:
    • The Contribute icon icon: to contribute it to its TB/Working Group for discussion, or decision.
    • The version of the draft, with a hyperlink to the file. Be default, the latest drafts uploaded will show. To see previous versions, click on the Plus icon.PNG
    • Its associated status.


Note: The Red cross icon.PNG will only appear next to available drafts that never been contributed, i.e. never submitted to a meeting as a contribution. Such non-contributed drafts may be deleted, yet the feature is only available to ETSI staff.

Download drafts

When a draft has been uploaded for a work item, its displayed version provides a link to download it. Login might be necessary before accessing the physical file.

Manage drafts

Uploading a new draft

After clicking on the Update icon icon, a pop-up will appear and prompt you for the following information:

  • The file to upload as latest draft
  • The version of the new draft (Vx.y.z) as it will appear on the portal
  • The maturity status of the uploaded new draft (early, stable, final).
  • Comments (optional)

Note also that the pop-up allows you to perform other tasks like:

  • Changing the maturity status of the last uploaded draft (eg: from stable to final)
  • Managing (change) target dates for the next milestones or the Work Item (depending on your role and access rights).

When the upload is successful, the Work Item schedule is updated in the workprogramme database : the "achieved date" for the selected maturity milestone is filled with the draft upload date and version. Any subsequent draft upload for the same maturity milestone will generate the insertions of a new line in the schedule with relevant achieved date and version

Note: The upload facility is disabled for the work items that are under TB Approval or TB resolution, they are "Frozen". The Update icon icon appears only for logged users who have upload rights.

Manage drafts

Changing the status of an available draft

When clicking on the Update icon icon, the upload pop-up will also allow some users (depending on their access rights) to update the maturity status of the last uploaded draft (eg: from Stable to Final draft).

When changing the status of an existing draft version, it is necessary to provide the following information:

  • targeted maturity milestone of the updated draft version
  • Comments (optional)

In the Work Programme schedule database, the corresponding achieved date for the targeted milestone is then updated with the current date.

If the targeted maturity milestone has already been marked as achieved, then a new schedule line is inserted with relevant achieved date and version.

Managing target dates for Work Item milestones

Only rapporteurs and Officials have the possibility to manage the target dates of their Work Items.

Rapporteurs can update the “early draft”, “Stable Draft”, and “Final draft” milestones of their drafts, which are maturity milestones.

Officials can also update the decision milestones: "WG approval", and "TB approval".

To do so click on the Update icon icon (same icon as to upload a new draft).

Then, from the the Manage drafts window that will pop-up, click on the Manage target dates button

Manage drafts.png

A second pop-up window will open:

Manage target dates.png

The system will then let the user enter and save new target dates dates for the milestones.